Melaka · Ongoing
The ATX Semiconductor Sdn Bhd facility in Melaka. Jayaland works under China Construction Yangtze River (M) Sdn. Bhd. (CSCEC) on this project, and our scope covers roadworks, water reticulation and drainage.
The photos show the 450 mm incoming water supply: pipe laying and welding on site, and night works at the road crossing with a crane and backhoe, with the pipe carried across the existing pedestrian bridge. The project is ongoing.