Skywiz Gangsa Residence
Work in progress
On-site detention (OSD) works

Retaining walls and water reticulation — taken on together with our roads, drains and earthworks, so the site infrastructure comes from one team.
Alongside our road, drainage and earthworks packages, we take on the infrastructure that goes with them: retaining walls for platforms, slopes and road edges, and water reticulation pipe works.
These works are built to the approved drawings and coordinated with the roads and drains, so levels, crossings and reinstatement are handled in one programme.
Typical jobs: Housing developments · Industrial projects · Commercial projects
Ask for a quote


Tampin, Negeri Sembilan
Earthworks · Roads · Drainage · OSD · Building works
View projectMelaka · Client: China Construction Yangtze River (M) · CSCEC
Roadworks · Water reticulation · Drainage
View project
Work in progress
On-site detention (OSD) works
Usually we carry them out together with the roads, drainage and earthworks. Send us the drawings and we will tell you what we can take on.
Jayaland is registered with CIDB at Grade G5, including category CE (civil engineering).
The drawings, the BQ or scope of work, site location and your programme or tender closing date.
Dalam Bahasa Malaysia: kerja infrastruktur, tembok penahan (retaining wall), retikulasi air, paip air.
WhatsApp us the drawings, BQ or just a site photo — we’ll come back with questions or a price.