Langat 2 Water Pipeline – Premix Works
Project

Langat 2 Water Pipeline – Premix Works

Taman Shamelin & Bukit Belacan, Kuala Lumpur · Completed 2024

LocationTaman Shamelin & Bukit Belacan, Kuala Lumpur
StatusCompleted 2024
Our scopeRoad milling · Premix paving · About 9 km

Premix works sub-contract for QSE Construction Sdn Bhd on Package 15(2) of the Langat 2 water treatment plant and water reticulation project: reinstating about 9 km of road along the pipeline route through Jalan Bukit Belacan and Taman Shamelin.

Our crews milled off the existing surface and laid new premix, to PAAB specifications. Much of the work was done at night, with the milling machine and tipper trucks working along the live road.

Services on this job

Milling the existing road surface at night
Milling the existing road surface at night
Milling machine and tipper truck on the milled surface
Milling machine and tipper truck on the milled surface

More projects

All projects

Planning something
like this?

Send us the layout and drawings. We’ll tell you how we’d build it and what it takes.

Tell us about the job

We usually reply the same working day.

Nothing is stored on this website. Your message opens in WhatsApp or your email app, where you can attach drawings before sending.
WhatsApp us